Trehir Landfill

    

      

 The works involved the construction of approximately 4.5Ha of landfill capping with associated leachate and surface water drainage. 
 Landfill Capping
  • Cut and fill to adjust slope
  • Supply and installation of sub-cap leachate drains
  • Excavation of refuse to accommodate toe details
  • Preparation of the existing waste surface
  • Supply and installation of a piped stone gas drainage layer with gas vents
  • Supply and installationof geosynthetic clay liner
  • Supply and installation of a stone drainage layer with collection and discharge pipework
  • Supply and installation of a soil capping layer
  • Supply and installation of associated geosynthetics
  • Construction of surface water drainage ditches, chambers and discharge pipework
  • Surface erosion protection and hydraulic mulch seeding
 Drainage
  • Supply and installation of new leachate drains
  • Supply and installaiton of new surface water drains
  • All associated temporary and permanent works
  • Interfacing with the Landfill Operator
  • Compliance with the requirements of the Conditions of Contract, Specifications and Drawings
  • Compliance with all trade, local nation and European Health & Safety, welfare and environmental legislation applicable to works undertaken on contaminated land and landfill sites.